Industrial

Matrix Technologies Corporation | Hudson, NH *

Construction of a new 36,000sf, $4.7 million corporate office/manufacturing facility, including clean room assembly facilities and medical products storage, as well as work at other corporate locations.

Matrix Marketing Corporation | Newington, NH *

Construction of a 45,000sf Corporate Headquarters and Distribution center for a computer reseller.

W.K. Hillquist, Inc. | Hudson, NH *

Fast track construction of a 36,000sf injection molding facility during winter conditions. While adherence to the project schedule was critical, the design had to remain fluid to allow the owner flexibility in the evolving form of the manufacturing layout.

Stanley Elevator Company, Inc. | Merrimack, NH *

Design/Build construction of a new, $1.25 million, 25,000sf corporate office, service, and distribution facility.

Labsphere, Inc. | Hampstead, NH *

Construction Management of 60,000sf facility, renovations and additions to the corporate office and plant. Project included new 45,000sf manufacturing and lab facility and renovation of new 15,000sf office and visitor center at a budget of $4.1 Million.

Burlington Self-Storage | Burlington, MA *

Construction of three two-story buildings for a state of the art, climate controlled self-storage facility with a gross floor area of 98,460sf.

American Florist | Bedford, NH & Cranston, RI *

Construction management of two 25,000sf floral distribution centers.

Hoyle Tanner & Associates | Manchester NH *

30,000 square foot renovation of existing mill space into modern tech environment.

SFC Engineering | Manchester NH *

Renovation of 12,000 square foot of existing mill space into enginnering offices and conference rooms.

Medtronics Interventional Vascular | Danvers, MA *

Design/Build of 9,600sf Class 100,000 cleanroom for manufacture of vascular catheters. Construction took place adjacent to another cleanroom awaiting renovation and monitoring showed no increase in particulate count during work. FDA testing confirmed the air quality exceeded design parameters by a factor of ten!

Technology/Specialty

INTEGRA Biosciences | Hudson, NH

Cleanroom expansion and renovation for a biomedical manufacturer. Construction took place during and around the 24/5 operation while maintaining a Class 100,000 rating.

LORAL Infrared & Imaging Systems*Lexington, MA

Space Instruments Clean Room with never-before-constructed 100 ton floating concrete floor, which floats on a cushion of air to maintain prescribed frequency and insulate equipment from earth vibrations.

Matrix Technologies Corporation | Hudson, NH *

Construction of a new 36,000sf, $4.7 million corporate office/manufacturing facility, including clean room assembly facilities and medical products storage, as well as work at other corporate locations.

Labsphere, Inc. | Hampstead, NH *

Construction Management of 60,000sf facility, renovations and additions to the corporate office and plant. Project included new 45,000sf manufacturing and lab facility and renovation of new 15,000sf office and visitor center at a budget of $4.1 Million.

Medtronics Interventional Vascular | Danvers, MA *

Design/Build of 9,600sf Class 100,000 cleanroom for manufacture of vascular catheters. Construction took place adjacent to another cleanroom awaiting renovation and monitoring showed no increase in particulate count during work. FDA testing confirmed the air quality exceeded design parameters by a factor of ten!

Adelphia Communications Corp. | Londonderry, NH *

Construction Management of new communications building and warehouse, including new communication lines to expand fiber backbone.

Retail

Hannaford Bros. | New England *

Construction of a 47,000sf Shop ’n Save. Winter conditions required the use of temporary hydronic heat to facilitate the placement of the floor slab to FF/FL=36/25 specifications. Also, renovation of facilities in Essex Junction, VT, Dracut ,MA, and Bedford, NH.

Purity Supermarkets | East Coast *

Renovation of retail stores in Lebanon, Salem and Plaistow, NH; Brookline, Malden and Tewksbury, MA; Wethersfield and Manchester, CT.

Continental Home | Bedford, NH *

Construction of an 18,000sf warehouse with a 4,000sf retail showroom.

Milltown Grille & Smuttynose Public House | Manchester, NH *

Design/build renovation of Manchester (NH) Airport’s only full-service restaurant and creation of new concourse deli and pub requiring extensive work in secure areas of airport.

LJ’s Restaurant | Salem, NH *

Full build-out of 8,500sf restaurant at Rockingham Mall.

Keybank | Multiple Locations, NH *

Built in five branches at several New Hampshire supermarkets, combining security with customer convenience, while meeting the owner’s strict deadline. Locations included Nashua, Concord, Bedford, and two in Manchester, NH.

Medical/Healthcare

St. Joseph Hospital | Nashua, NH *

Renovation and new construction to create The Breast Health Center, a 6,000sf diagnostic facility including multiple mammography units, ultrasound and medial gas installation. Construction start 12/16/99 – Completion 4/6/00, including punch list.

St. Joseph Hospital | Nashua, NH *

Renovation to Cardiac Catheterization & Angiography Labs including coordination of medical gas, mechanicals and installation of Philips Angio Diagnostic and Integris V5000 Catheterization Units. Construction staged to accommodate medical equipment delivery – Zero punch list project!

Southern NH Regional Medical Center | Nashua, NH

Construction of a new radiology lab completed without disruption of ongoing hospital operations.

Webster Medical Center | Webster, MA *

A 20,460sf three-story medical arts building designed for the addition of a future fourth floor and a linear accelerator facility.

Truesdale Health | Fall River, MA

Consultant on three story medical office building at the Truesdale Health campus adding approximately 46,000 square foot. The existing site infrastructure was modified and updated.

Institutional/Non-profit

Minute Man Arc | Concord, MA

Minute Man Arc, Concord MA – Renovation of three level building to create programming and administrative space for an organization providing services for children and adults with disabilities.

River Mead | Peterborough, NH *

Construction of a 30,000sf addition to this full-service life care retirement community, including Alzheimer’s and assisted living quarters with complete skilled nursing and attendant support systems. Project budget: $3.05 Million.

Villas at Courville | Nashua, NH *

Construction of senior housing and assisted living facilities.

Boys and Girls Club and Theatre | Milford, NH *

Construction of a new Boys and Girls Club that included extensive renovations to the former American Stage Festival Theatre.

Recreational

Boys and Girls Club and Theatre | Milford, NH *

Construction of a new Boys and Girls Club that included extensive renovations to the former American Stage Festival Theatre.

Hampshire Hills Fitness Club | Milford, NH *

Renovate four racket ball courts into a new state of the art fitness center.

US Air Force, Hanscom AFB | Bedford, MA *

Renovate pool facility, including the Olympic size pool.

Educational

World Academy | Nashua, NH

Construction of two story Middle school addition ($6.2M) with competition gymnasium and soccer field. The current school, which has over 250 students, remained open during construction which included extensive sitework and blasting.

Searles School, Library & Chapel | Windham, NH *

Restoration and conversion of historic library, school and chapel, part of Searles Castle property. The facility is presently used as a venue for art shows, weddings and other functions.

Phillips Exeter Academy Children’s Center | Exeter, NH *

Construction of a 9,000sf child care center.

Meritor Academy | Middleton, MA *

Meritor Academy is a private for-profit school. The 10,000sf facility provides classrooms and media center/library for grades K-5. This hyper track project, completed in 8 weeks, required the complete interior demolition of existing structure and renovation of both interior and exterior. The project was completed prior to the planned September opening.

Hesser College | Manchester, NH *

Fast-track construction of new library facilities in existing mill building. This 9-week project included construction of physical therapy labs and new dormitory facilities.

Franklin Pierce College | Rindge, NH *

Renovation of the dormitory facilities in the Crestview Building and conversion of the student union building into administrative offices at the campus. Strict adherence to the schedule was of the utmost concern in this construction management project to meet the housing commitments of the College.

World Elementary, Small World Country Day School & Child Development Center | Nashua, NH *

Fast track construction of a new 18,000sf early childhood learning center and elementary school with complete library, foodservice and recreation facilities as well as a second phase addition of some 6,000sf including an atrium walkway to outbuildings. Initial project completed in 12 weeks at a budget of $1.8 million.

Creative Years Child Development & Learning Center, Inc. | Nashua, NH *

Construction management for a 10,000sf early learning center. The existing industrial building was used as the structural frame for the building requiring a high degree of coordination and communication with the design team to assure that every aspect of the completed facility transitioned to the existing structural detail without notice.

ARAMARK Educational Resources | Learning Centers in Nashua, NH, Loudon County, VA, and Germantown, MD. *

All within restricted schedules requiring delivery of facilities commensurate with new term openings at budgets varying from $750,000 to $890,000. Work included construction of centers in West Bridgewater, MA; Andover, MA, and Salem, NH.

Faith Communities

All Saints Parish | Brookline, MA

Renovation of an historic four story building to house the Rector and family as well as the construction of three high-end residential units.

Searles School, Library & Chapel | Windham, NH *

Restoration and conversion of historic library, school and chapel, part of Searles Castle property. The facility is presently used as a venue for art shows, weddings and other functions.

Faith Christian Center | Bedford, NH *

Design Services and construction of a new 600-seat worship center with attendant offices, classrooms and fellowship areas. In addition, construct a separate building of approximately 7,200sf to house operations of FAFIN and other mission ministries.

The Congregational Church | Amherst, NH *

Structural renovation of the 230-year-old church included rebuilding of the sills, reinforcement of the frame and soffit, reconstruction of the bell tower and clockworks and installation of a new slate roof. Phase II included a 4,100sf addition to the community building, elevator installation, reconfiguration of the organ bay and preparation for the next phase of work.

The Church of Jesus Christ of Latter-Day Saints | Roslindale, MA and Nashua, NH *

Church Building renovations and additions to facilities.

* Projects completed as Project Executive with Fulcrum Associates.